Technical Program Manager, Data Center Construction and Design
Company: Google
Location: Reston
Posted on: April 7, 2026
|
|
|
Job Description:
info_outline X Applicants in the County of Los Angeles:
Qualified applications with arrest or conviction records will be
considered for employment in accordance with the Los Angeles County
Fair Chance Ordinance for Employers and the California Fair Chance
Act. Applicants in San Francisco: Qualified applications with
arrest or conviction records will be considered for employment in
accordance with the San Francisco Fair Chance Ordinance for
Employers and the California Fair Chance Act. Note: Google's hybrid
workplace includes remote and in-office roles. By applying to this
position you will have an opportunity to share your preferred
working location from the following: In-office locations: Reston,
VA, USA; Austin, TX, USA; Council Bluffs, IA, USA; Moncks Corner,
SC 29461, USA; New York, NY, USA; Sunnyvale, CA, USA; San
Francisco, CA, USA. Remote location(s): California, USA; New York,
USA. Minimum qualifications: Bachelor's degree in Engineering,
Construction Management, a related technical field, or equivalent
practical experience. 10 years of experience in program or project
management specifically within mission-critical facilities (e.g.,
data centers, chip fabrication plants) or a design-build/real
estate development environment. 8 years of experience with
construction, spanning the entire life-cycle from programming
through commissioning. 8 years of experience in a leadership role,
including managing capital projects. Ability to travel up to 25% of
the time domestically and internationally as required. Preferred
qualifications: Master's Degree or PhD in Electrical Engineering,
Mechanical Engineering, Industrial Engineering, Construction
Management, or a related technical field. Experience with data
center equipment and environments (e.g., switchgear, generators,
chillers, controls, fire safety systems). Experience in the design,
construction, and commissioning of facilities with medium voltage
and low voltage electrical distribution systems. Experience
managing teams to deliver industrial-type capital projects,
including engineering, construction management, and project
controls. Understanding of the start-up and commissioning
processes. Ability to manage effectively within a cross-functional
organization, including managing commissioning programs and
cross-functional projects. About the job A problem isn’t truly
solved until it’s solved for all. That’s why Googlers build
products that help create opportunities for everyone, whether down
the street or across the globe. As a Technical Program Manager at
Google, you’ll use your technical expertise to lead complex,
multi-disciplinary projects from start to finish. You’ll work with
stakeholders to plan requirements, identify risks, manage project
schedules, and communicate clearly with cross-functional partners
across the company. You're equally comfortable explaining your
team's analyses and recommendations to executives as you are
discussing the technical tradeoffs in product development with
engineers. As a Technical Program Manager, you will initiate and
lead our technical programs, driving them from concept to
successful execution. You will require technical judgment to
navigate ambiguity, make critical trade-offs between engineering
and business needs, and ensure outcomes align with long-term
organizational objectives. In this role, you will be a central hub
for stakeholder management, building trusted relationships with
cross-functional leaders and proactively resolving misalignment.
You will not only deliver on key initiatives but also establish
new, proactive programs that embed a culture of continuous
improvement and high performance across the technical organization.
Behind everything our users see online is the architecture built by
the Technical Infrastructure team to keep it running. From
developing and maintaining our data centers to building the next
generation of Google platforms, we make Google's product portfolio
possible. We're proud to be our engineers' engineers and love
voiding warranties by taking things apart so we can rebuild them.
We keep our networks up and running, ensuring our users have the
best and fastest experience possible. The US base salary range for
this full-time position is $240,000-$334,000 bonus equity benefits.
Our salary ranges are determined by role, level, and location.
Within the range, individual pay is determined by work location and
additional factors, including job-related skills, experience, and
relevant education or training. Your recruiter can share more about
the specific salary range for your preferred location during the
hiring process. Please note that the compensation details listed in
US role postings reflect the base salary only, and do not include
bonus, equity, or benefits. Learn more about benefits at Google .
Responsibilities Lead the design, construction, and capital project
support for ongoing operations, providing strategic and tactical
oversight to deliver large-scale data center projects from concept
to execution. Develop and mentor teams of engineers and project
managers, while serving as a key partner and development lead for
general and trade contractors. Act as the strategic central hub for
stakeholder management, building trusted relationships with
cross-functional leaders to navigate ambiguity and resolve
misalignment without direct authority. Foster a forward-thinking
culture that prioritizes continuous improvement, ensuring
construction outcomes align with long-term organizational
objectives and verifying construction fundamentals from programming
through commissioning.
Keywords: Google, Aspen Hill , Technical Program Manager, Data Center Construction and Design, Engineering , Reston, Maryland